建筑类常见词汇句子翻译.docx_第1页
建筑类常见词汇句子翻译.docx_第2页
建筑类常见词汇句子翻译.docx_第3页
建筑类常见词汇句子翻译.docx_第4页
建筑类常见词汇句子翻译.docx_第5页
已阅读5页,还剩57页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

Amount ItemDescriptionUnitQty Rate, UGX. Ushs BILL NO. 5DAY WORKS(ALL PROVISIONAL)In accordance with Clause 13.6 of the Conditions of Contract, the Contractor will be paid day work ratesfor extra work that cannot properly be measured and valued, and the Contractor is to insert in the spaceprovided below the basic rates and costs of labour, materials and plant as described hereunder:- LABOURAWALLERhours1 BCARPENTERhours1 CSCAFFOLDERhours1 DJOINERhours1 EPLUMBERhours1 FELECTRICIANhours1 GPLASTERERhours1 HPAINTERhours1 JLABOURERhours1To the basic nett rates of labour used for work carriedout on dayworks, an addition 30 % percent which is toinclude for task work and incentive schemes, tools,standing, scaffolding, supervision, insurace, transportprofit and overheads.%To collection of Day works5/1MATERIALSAMarmoran Finish Per SQ.M.1 BArmstrong Suspended Ceilings Per SQ.M.1 CGypsum board Ceilings Per SQ.M.1DCementPer Tonne1 ELimePer Tonne1 FSandPer Tonne1 GAggregate (grade 25 - 5mm)Per Tonne1 HHardcorePer Tonne1 ISteel reinforcement (i) Mild steel barKg1 (ii) High tensile barKg1JBRC A 142 Fabric Mesh Steel Reinforcement 2.4 x 48MPer Roll1KAPP-Modified BitumenPer SQ.M1LWrot timber (Mahogany)Per C.M1MSteel formworkPer SQ.M1N2mm thick approved aluminium roof edge trimPer M1OApproved Anti-termite treatmentPer 4 Litres1PPaint, GlossPer 4 Litres1QPaint, EmulsionPer 4 Litres1RMahogany VarnishPer 4 Litres1S200mm diameter PN6 uPVC water pipe 6MPer Each1T160mm diameter PN6 uPVC rainwater downpipe 6MPer Each1UDitto bendsPer Each1VDitto offsetsPer Each1WDitto watershoePer Each1XFixing bracketsPer Each1YFixing screwsPer Packet1ZStructural glazingPer SQ.M.1To collection5/2A2750mm x 1830mm x 12mm Melawood boardPer No.1B10mm Clear sheet glassPer SQ.M.1C8mm clear sheet glassPer SQ.M.1D6mm clear sheet glassPer SQ.M.1E10mm Translucent glassPer SQ.M.1F8mm Translucent glassPer SQ.M.1G10mm clear PVB glassPer SQ.M.1H8mm one way reflective glassPer SQ.M.1IComplete PC Econo locksetPer Each1JComplete WC Econo locksetPer Each1K102mm x 76mm stainless steel butt hingePer Each1LLever Action Flush boltPer Each1MCoat HooksPer Each1NIndicator SignagePer Each1ODoor stopPer Each1PDoor closerPer Each1QSolid clay bricksPer Each1R450mm x 200mm x 100mm hollow concrete blocksPer Each1S450mm x 200mm x 100mm solid concrete blockPer Each1T450mm x 200mm x 150 dittoPer Each1U400mm x400mm x 10mm Porcelain tilesPer SQ.M.1V600mm x 600mm x 10mm granite tilesPer SQ.M.1W300mm x 200mm x 6mm Ceramic tilesPer SQ.M.1To collection5/3A300mm x 300mm x 300mm Maxpan blockPer SQ.M1B25mm x 3mm earth copper tapePer M1C70mmsq bare copper cablePer M1D35mmsq PVC/SWA/PVC copper cablePer M1E35mmsq XLPE/PVC copper cablePer M1F2.5mmsq. SC PVC copper cablePer M1G35mmsq. SC PVC-I copper cable Per M1H25mm Heavy gauge PVC conduitPer M1IT5 1x28W 1200mm single bare batten fluroscent luminarePer Each1JT5 4x14W,600x600mm recessed fluroscent luminarePer Each1K3 section PVC trunking size 250x65mm as Marshall Tufflex Per M1L6.0mmsq. 4C PVC-SWA-PVC copper cable Per M1M10.0mmsq SC PVC-I copper cablePer M1N2.5mmsq. 4C PVC-SWA-PVC copper cable Per M1O1.5mmsq SC PVC-I copper cablePer M1P100mm diameter galvanised steel tubing 6MPer M1Q100mm diameter chlorinated poly vinyl chloride (CPVC) pipes 6mPer Each1R80mm diameter dittoPer Each1S65mm diameter dittoPer Each1T25mm diameter dittoPer Each1U80mm diameter CPVC globe valvesPer Each1V65mm diameter dittoPer Each1W25mm diameter dittoPer Each1To collection5/4A15mm diameter CPVC angle valvesPer Each1B160mm diameter uPVC soil waste water pipe 6MPer Each1C110mm diameter dittoPer Each1D38mm diameter dittoPer Each1EFloor trapPer Each1F110 x 50mm diameter trapped floor gullyPer Each1G110mm ditto floor gully inletPer Each1H110mm diito wc connector P outletPer Each1I32mm ditto self-releasing bottle trapPer Each1J40 x 32mm diameter socket reducerPer Each1K50mm Bronze gate valvesPer Each1LS trap WC bowl to BS 3402Per Each1M32mm diameter back entry, low pressure flush valvePer Each1N530 x 450mm counter top viterous china wash hand basin with one tap holePer Each1OArmitage Shanks viterous china semi-recessed toilet roll holder completePer Each1PAutomatic hand dryerPer Each1QArmitage shanks viterous china urinal bowl completePer Each1RAriston 80 liter pressure type water heaterPer Each1S6mm Plane glass mirror size 610x 475mmPer Each1Tsingle bowl single drain stainless steel kichen sink size 1000 x 500 x 200mmPer M1To collection5/5COLLECTIONPage5/1Page5/2Page5/3Page5/4Page5/5To the basic nett rates of materials used for work carriedout on dayworks, an addition of 30% which is toinclude for unloading and storing as necessary,the use of hand plant, and machinery etc. availableon site, profit and overheads.%To collection of Day works5/6PLANTAD4 Tractor or equivalentHrs3 - BD7 Tractor or equivalentHrs3 - CMotor Grader Cat. 14 or equivalent (complete with scarifier)Hrs3 - D2 1/4 cu. Yd. Tractor excavator with loader attachmentHrs3 - EMechanical excavator with 22 cu. Ft bucket capacity or equivalentHrs3 - FPortable Compressor with 2 breakers or equivalentwith 1500 mm hoses and reelshours3 - GDamp Truck (0.75 tonne)hours3 - HLorry tipper (7 tonne)hours3 - JConcrete Mixer (14/10) complete for weight batch mixinghours3 - K50 mm self priming centrifugal pump with hose and ancillary equipmenthours3 - LConcrete Vibratorshours3 - - To the basic rates of plant used for work carried outon dayworks, an addition of 30% per cent, which isto include for driver and/or attendance, fuel andconsumable stores supervision, insurance, road licence,profit and overheads. - To collection of Day works - COLLECTIONCOLLECTIONLABOUR - MATERIALS - PLANT - TOTAL CARRIED TO GRAND SUMMARY - 5/7 Amount ItemDescriptionUnitQuantity Rate USHS PROPOSED CONSTRUCTION OF UGANDAREVENUE AUTHORITY HEADQUARTERSBUILDINGS AT NAKAWAPARKING TOWERBILL NO. 4GENERAL SUMMARY OF LEVELSDEMOLITIONS - LEVEL 1 - LEVEL 2 - LEVEL 3 - LEVEL 4 - LEVEL 5 - LEVEL 6 - Total Carried to Grand Summary SHS. - Amount ItemDescriptionUnitQuantity Rate, UGX. USHS PROPOSED CONSTRUCTION OF UGANDAREVENUE AUTHORITY HEADQUARTERSBUILDINGS AT NAKAWAPARKING TOWERBILL NO. 4ELEMENT NO. 2R.C SUPERSTRUCTURE The prices for the following ready-mix concrete by asupplier with capacity of not less than 250M3 placementper day are to include for filling into formwork, well vibrating and packing around rod reinforcement(measured separately)Reinforced insitu concrete gra

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论