1、道桥毕业设计篇一:路桥专业毕业设计本课题以盐河(杨庄一武障河)航道整治工程 YH-ZMCZ-TJ标朱码二线船闸土建工程为依托,重点研究了桥 梁接线道路工程的施工方案,主要包括路基路面工程和挡土 墙工程。论文包括工程简介、施工准备、施工工艺、施工平面布 置;其中施工准备从人、材、机及现场“四通一平”等方面 说明开工前必备的生产要素,指出该分部工程总体施工思 路。施工工艺以流程图的形式介绍挡土墙工程、路基工程、 水稳碎石工程、沥青路面工程各施工工序的先后顺序及逻辑 关系。其他施工方法、技术要求及质量标准则以工序施工为 研究对象,对其施工思路、程序、操作要点及规范要求等进 行说明。施工平面布置则对施

2、工现场生产、生活设施进行合 理安排,以满足安全有序施工的需要。本文以本项目施工设计图及公路工程施工技术规范为 依据,通过查阅相关施工手册和规范,结合工程实际,编制 该分项工程施工方案,全面去考虑各项施工条件,确定合理 的施工顺序、施工方法,制定了较有效的技术措施,为现场 施工提供参考。关键词:挡土墙路基水稳碎石沥青路面This topic is based on the channel regulationproject of Yanhe and the civil work of YH-ZMCZ-TJstandard Zhuma second-tier ship lock, and main

3、lystudies the constructionprogram on the bridgeconnection road works,including the subgrade andpavement engineering aswell as theretaining wallproject.Thepaper includesprojectdescription,constructionpreparation, constructiontechnology andconstructionlayout. The constructionpreparationexplains the ne

4、cessary production factors before construction from the aspects of people, materials, machines and site "Sitong Yiping", and points out the general construction ideas of each sub-project. The construction introduces the order and logic relations of various constructions like retaining wall

5、 project, subgrade engineering, cement-stabilizedmacadamproject and asphalt pavement engineering in the form of flow chart. Other construction methods, technical requirements and quality standards take the process of construction as the research objectives, and conduct explanation on the constructio

6、n ideas, procedures, operating points and regulatory requirements. Thelayout of the construction makes reasonable arrangements on the production of construction site and living facilities so as to meet the needs of the safe and orderly construction.Based on the project construction design and road c

7、onstruction technical specification,throughconsulting the relevant construction manuals and specifications, and xxbined with engineering practice, this paper formulates the construction program of the sub-projects, xxprehensively considers the various construction conditions, determines the reasonab

8、le construction order and construction methods, and develops relatively effective measures to provide a reference for the site construction.Keywords:retaining wall projectsubgradeengineeringcement-stabilized macadamprojectasphalt pavement engineering目录摘1Abstract2 -1.绪论1.1引据11.2编制依1况1.3工程概1.412.2.1通讯

9、2备.2.施工准32.1组织准备.32.1.1项目管理组织及人员分工.32.1.2施工组织管理网络.32.2资源准备 4222水源42.2.3电力42.2.4 设备、人员、材料的到场42.2.5施工机械及人员投入(本工程施工机械见附一)42.3技术准备 4231组织施工人员以及相关技术人员进一步熟悉、研究并核对设计文件42.3.2制 定 施 工 组织5施工方案3.63.1总体思路63.2施工准备63.2.1施工测量66料3.2.3材.73.3 南 接麦线道路附属工程-挡土墙施工.83.3.1工程简介83.3.2 工期分配以及施工部署.83.3.3 施工方案及技术措施83.4路基工程图.133.

10、4.1工艺流程143.4.2填方路基的压实.143.5水稳碎石基层.16求.3.5.1材料要163.5.2 水泥稳定碎石 的级.163.5.3173.5.4173.5.5173.5.63.61717361购料366沥 青 混 凝 土 摊173.6.2工-艺流程.173.6.3施工准备.183.6.4沥青混凝土拌和.183.6.5沥青混凝土运输.19铺19367碾压20368 沥青路面面层病害及防治203.7 中 间 检 查 与 验收213.7.1挡土213.7.2 路基施工中的检查与验收233.7.3路面基层、底基层施工的质量要求与检查验收234. 冬、雨季情况下施工措施254.1 冬 季 施

11、 工 防 护 措施254.2 雨 季 施 工 防 护 措施265. 施 工 保 证 措施285.1 施 工 质 量 保 证 措施28施5.2施 工 进 度 保 证 措295.3 施工安全文明保证措施.315.3.1安 全 施 工 措施315.3.2 文明施工与环境保护.316. 施 工 安 全 应 急 预案336.1编制依据336.2336.3 预 案336.3.1 应急救援336.3.2 应急救援小346.4 安 全 生/Hi、6.535446.6 相 关 的 保 障 措 施446.7 与相关应急预案的衔接关系456.8 应急预案管理的措施和要求456.9附则457.结语46致谢.47参考献

12、48495153篇二:论文瑞金K26+000-K28+218二级道路设计摘要在本设计中,主要是进行瑞金二级公路的设计。设计部 分的公路全长2218m,设计车速80km/h,双向两车道,使用 公路一级荷载。根据使用性质和任务,确定了公路的等级。查找相应技 术规范和以及设计需要的各种参数,结合地形条件在平面图 中进行路线方案比选。选择一个最佳方案进行详细技术设 计,内容包括路线平、纵、横设计,路基路面设计和排水设 计,桥梁设计以及施工组织设计,并完成施工图设计阶段应 完成的各种图、表和设计说明书。关键词:平、纵、横设计;路基路面;桥梁;施工 组织The Secondary Road Design

13、of RuijinFrom K26+000to K28+218AbstractThe design is mainly the secondary road design of the west of Jiangxi province and the length of this road which I devised is 2218m.the speed of the design is 80km/h and it is two-lane two-way. the design loading for road is highway- n level.According to the gi

14、ven service level and attribute of the highway , the highway is defined as the second-grade road. After Searching corresponding technical specifications and the parameters of the design and xxbining the local natural condition and through analysis and xxparision of several feasible plans,the most pr

15、oper one of these is rexxmended and subsequently carried out in detail which it includes line level, longitudinal and transverse design, pavement design,drainage design, bridge design and construction design.During the construction design phase, a variety of graphs, charts and design specifications

16、should be xxpleted.Keywords: line level, longitudinal and transversedesign subgrade;pavement; Bridge; construction organization绪论一、概况该公路位于丘岭区,为平原微丘区二级公路,双向二车 道,设计行车速度为80km/h,路基宽度12米,路面结构拟选 沥青混凝土路面。桥涵设计荷载:公路-口级。二、自然地理条件1.地形地貌本合同段在大的地貌单元上属瑞金地区,区内次一级的 地貌单元主要为丘峰沟地地貌,峰丛洼地、残丘坡地地貌, 其地势起伏较大,地面标高在238362m。2.气

17、象条件该段公路,处于亚热带季风,潮湿型气候区,其特点是温湿多雨,干旱季节分明,区内气温一月最冷,七月最热,多年平均气温 13.7 C19.1 C,最高 39 C,最低-7 C,每 年冬春(12月至翌年4月)气候干暖,降水量少,夏秋(5 月至8月)湿热,降雨量集中,年降水量 10001400mm。三、工程地质条件1.地层路线经过地段,基岩普遍出露,植被较稀少。2.地质构造:区内地层总的呈单斜构造,主要断层为上木札断层。单斜构造:勘区岩层走向总的呈北西、南东方向延伸,倾向北东,岩层产状:45°70° 19。52°,局部地段受 断层影响略有变化。上木札断层:该断层长26

18、公里以上,逆断层兼有顺扭平移,地层断距800 m,在本合同段延伸方向为 340。左右。断层产状:倾向北东、倾角5070°,见糜棱岩宽5m。 该断层总体走向与路线走向基本一致,在某些部位与路线发生交叉。对路线的兴建有一定的影响。3.水文地质受构造及岩性控制,勘区地下水类型有碳酸盐岩岩溶水,基岩裂隙水、松散土层孔隙水三种类型。碳酸盐岩岩溶水分布最广,水量较大,一般以泉水的形式出现,除当地居民饮用外,还用于灌溉农田。基岩裂隙水,属于风化带裂隙水,分布于裂隙发育的山体表层, 一般地下水埋藏较浅且随地形起伏变化,一般 27 m,受大气降水补给,就地排 泄,一般水量不大。孔隙水、零星分布于有泉点

19、出露的冲沟 一带及落水洞被堵塞的低洼地段,水量微小,以渗流为主。4.不良地质现象:勘区经过大量农田和池塘,软土地基较多,地质情况较差,需进行路基处理。5.地震:工程区内地震活动频繁,但震级不大,一般对工程建筑 危害轻微。该区域属地震烈度W度区,一般工程可不设防。四、路线主要技术指标道路作为一条三维空间的实体,是由路基、路面、桥梁、涵洞、隧道和沿线设施所组成的带状构造物。公路的路线位 置受社会经济、自然地理和技术条件等因素的制约。我们设 计的任务就是在调查研究、掌握大量材料的基础上,设计出 一条有一定技术标准、 满足行车要求、工程费用最省的路线。路线的各项指标如下表格:根据本段路线所处路段,综合

20、全路段的路线走向及线形 要求,本路段共有2个交点,平曲线线形见下图。平曲线线形图五、路线布设情况1.丘陵区选线要点。丘岭区选线应综合考虑平、纵、横 三者的关系,恰当地掌握标准,提高线形质量。设计中应注篇三:道桥专业毕业设计正文辽宁工程技术大学毕业设计(论文)、八、-前言本设计的题目为铜汤高速石汤段第三标段高速公路设 计,本设计是按照道路设计的步骤和方法,采用最新的高速 公路设计规范标准,结合具体的地形、地质、地貌以及水文 情况,严格编写而成。本设计是根据所给的比例为(1:20XX )的地形图,以安 徽省的气候、地质情况为依据,按照交通土建专业毕业设计 的大纲要求,对资料进行整理、分析,并在指导

21、教师的帮助 下编制而成。毕业设计是教学计划中最后一个重要的教学环节,是培 养学生综合应用所学的道路交通基础理论、基本知识和基本 技能,进行道路设计或科学研究的综合训练;毕业设计是前 面教学环节的继续、深化和扩展,是学生综合素质和实践工 作能力培养的重要阶段。本设计的主要内容包括:道路的选线及定线、道路平面 设计、道路纵断面设计、道路横断面设计、公路路基设计、 公路路面设计、公路排水设计、附属物结构设计以及英文翻 译。本设计参阅了道路勘测设计、道路工程技术标准路基路面工程、专业英语等专业文献。由于专业知识掌握水平有限,没有实际施工经验,在设 计中难免有遗漏和不足之处,恳请各位老师、同学给予批评

22、和指正。赵大明:铜汤高速石汤段第三标段设计1原始资料本设计是交通土建专业毕业设计,设计任务是铜汤高速 石汤段第三标段公路设计。本设计的原始资料为地形图一幅(比例1:20XX),地形、地貌、地质、气候、水文等设计资 料以安徽为依据。1.1 地形、地貌、水文状况由北至南地貌特征分别为平原,山区。东西方向为10kv的高压线,在地形图的东北角为村庄,在平原的中部为城镇 延伸方为东南自西北方向,平原地区有两条南北方向的高速 公路,其中间有两个水库,地形图西南角靠近山体存在一个 城镇。 地形图整体呈现由山体到平原再到山体的大致分布。 海拔高度差不大便于施工的展开。平原地区有几处水塘,路 线设计时应尽量避免

23、。1.2 地质、气候状况此处土质为粘性土,无不良地质现象,地质稳定。安徽的气候类型属于暖温带向亚热带的过渡型,此处地 形的气候特点为:气候温和,日照充足,季风明显,四季分 明。1.3 本设计的主要技术标准现依据规范将高速公路的设计指标列出如下:设计车速:100( km/h); 车道数:4;单车道宽:3.75 ( m ;直线最大长度:20V=20XX( m ;同向圆曲线间的直线最小长度:6v=6oo( m ;反向圆曲线间的直线最小长度:2V=200(;圆曲线极限最小半径:400 ( m ;圆曲线一般最小半径:700 ( m ;回旋线 最小长度:85( m);平曲线长度一般值:500( m ; 平 曲线长度最小值:170( m ;停车视距:160( m ;辽宁工程技术大学毕业设计(论文)最大纵坡:4 ( % ; 最大合成坡度值:10 ( % ; 最 小纵坡:0.5 ( % ; 最小坡长:250( m ;凸形竖曲线最小半径一般值:10000( m); 凸形竖曲线最小半径极限值:6500 ( m ;凹形竖曲线最小半径一般 值:4500( m ;凹形竖曲线最小半径极限值:3000( m ;竖曲线长度一般值:210( m ;竖曲

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论