产品质量检验报告-BBB.doc_第1页
产品质量检验报告-BBB.doc_第2页
产品质量检验报告-BBB.doc_第3页
产品质量检验报告-BBB.doc_第4页
产品质量检验报告-BBB.doc_第5页
已阅读5页,还剩2页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

B. MainframeMaterial qualityMain sizeItemRequired sizeInspection resultConclusionInner size Central distance of slide rail on first-order Central distance of slide rail on second-orderDiagonalerror3 ()General height Welding lineSolderer and his aptitude(intermediate): Mr. Wang Tao ;Mr. Zhu Yaming Certificate no.:Item RequestInspection resultConclusionThickness of the sheetshouldergrooveheight of welding line on corner shouldergrooveheight of welding line on cornerWelding line checkSmooth surface without any weld beading, cinder inclusion, air hole and crackle Checker:Serial NumberSpecificationInspection resultConclusionAMovement or jumpiness occurred on the circular board of the toothed plate on the drum should be 5mm in the radial direction, when it is running.BThe toothed plate fixed in the drum should be reliable without any loose. CInspection in the static balance state When the drum is rotated or reversed for about 10 times, any rest point could not be found to match together. Checker:C. Teethed drumsMain partial inspectionSerial NumberCheck taskInspection resultConclusionaThe drums can nimbly rotate under manual action, and any stop or rub from them can be found.bEvery joint should be sealed perfectly without any leakage. cDisplacement or jumpiness occurred on end plane of the belt pulley should be 0.5mm and 0.3mm in the radial direction, when it is running.dAfter installation, relative displacement on the symmetrical plane of the triangle belt pulleys should be 2/1000 of its central distance. eMachine should be ensured to work reliably and smoothly.D. Inspection under lost motionSerial NumberCheck taskRegulate specificationInspection resultConclusion1The time of idling continuous running should be longer than (h)2The bearing temperature ()3Tiptop temperature of the bearing ()4Tiptop swing of the bearing block under operation()5Swing of the complete appliance on test-bed()6Noise far away 1 meter from machine under operation7It runs steadily without any blocking, bumping or strange sound to come8All fasteners and screws work very well. Checker:E. Observational checkSerial NumberCheck taskRegulate specificationInspection result1Perfect assemble2There is no knocking scar to be found.3Non-matched machining surface should be painted with anticorrosive varnish4There is no concave, uneven appearance to be found on the surface of it. Painting performance should be smooth and the luster should be also consistent without any the flow trace, leaks or shells 5Packaging answers for the relative stipulations.6Spare parts and special tools will be serviced as requested.Checker:F. Electric testSerial NumberCheck taskRegulate specificationInspection resultthree-phase voltageStart-up timeStart-up currentSwitched currentTest of guard modeTest of escape actionTest of temperatureDebugged value of XSL8 temperature inspectorDebugged value of XSM velometerInsulation resistance on Control CabinetNotes: Run-in motorChecker:Huanglong Crushing-conveyor Manufacturing Co; Ltd, Jiangyou city, Sichuan province, P. R. China Date: Report on Noise Monitoring Model: Serial code:Item: noiseGoal: comprehension on noiseMonitoring date:Report date:Test gadget :AWA6218B Integral sound level meterTest condition: fair、windlessMethod: How to measure a noise around industrial unit.Result: Unit: dB(A) Check pointPeriod of timeContinuous equivalent sound level Sketch map on check point: Authorized: Liu QinmeiCheck-out:Issue:Date:Date:Date:Quality Certificate issued by Linfen Steel ( Taiyuan Group ) Co., LtdDestination:Long tanshi Issue date: Consignee: Shijilianfa steel Co., Ltd, Sichuan Cargo: Structural steel plateDelivery:Vehicle No.: Net weight: ton Theory weight: tonFurnace no. Brand no.Lot no.Thickness()Piece no.Weight(t)Ingredient(%)Tensile strengthYield limitSpecific elongation5(%)V Impact(vertical)JCold bentNotes Contract no.: Number:Page: / Tab: Xue Yaofeng Authorized:需翻译的图纸文字1. Press Start-up Bottom for 1# motor on control cabinet and the flexible starting acts. After 1# motor gets to run, the pilot lamp will be light and the flexible starting will turn to bypass operation. And then repeat the above steps on 2# motor. When you find 2# motor goes well, please press Start-up Bottom for feeding material and wait for the pilot lamp to be light till the machine gets in good order.2、一、二级保险销Safety pins on first-order and second-order 3、二级异型拉板Shape plank on second-order 4、推荐五年备品备件 Spare parts to be recommended for service in 5 years. 5、备注: 以上报价均含税费不含运费,另购Notes: The above quotation including tax will be effective free of freight, it needs to be imported 6、呆扳手Solid wrench7.套筒扳手Box spanner 8、内六角扳手inner hexagon spanner 9、专用工具清单List of special tools10、用于主机安装和地脚螺栓二次定位固定 Just for fixation in ground bolt location and framework installation 11、用于拆除机架一、二级门如内部检修 Just for overhauling when the gateway on first-order and second-order of the framework is taken down.12、用于调整闪退装置上螺母及齿辊间的距离 Just for adjustment of interval between nut and toothed drum on the escape device. 13、用途 Purpose 14、25N窄V带25N V-belt 、 中南橡胶厂Middle South Rubber Factory 15、随机备品备件清单List of spare parts attached to the machine 16、14套纸质文件 Fourteen sets of document 17、光盘 CD 18、设备铭牌拓印件 A copy of the nameplate 19、KKS编码表 KKS code table 20、监造和见证文件 Supervision and witness papers

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论